Contact News

Design review and supervision for ITS and weigh-in-motion

CAREC Corridor 2, Karakalpakstan. Tender documentation, bid evaluation, verification of the contractor's design and supervision through to defect liability — all integrated into the Republican Traffic Control Centre.

Assignment
Design Review & Supervision Consultant for WIM/ITS (ADB Loans No.: 3965-UZB / 3963-UZB, Central Asia Regional Economic Cooperation Corridor 2 Karakalpakstan Road (A380 Kungrad to Daut-Ata Section) Project, Project No.: 48414-006, Contract No.: KRP/OCB/QC BS-02)
Client
State Committee for Automobile Roads under the Ministry of Transportation of the Republic of Uzbekistan
Financed by
Asian Development Bank
Location
Tashkent Region and Ferghana Valley, Uzbekistan
Period
2021 – ongoing
Sector
Transport & intelligent transport systems

Procurement, design, supply and installation of Intelligent Transportation System (ITS) and Weigh in Motion (WIM). The ITS and WIM systems created for during the project serve as the basis for the future planning and strategic development of the ITS and WIM of the Client. All components of the system will be integrated into a single monitoring object in the Republican Traffic Control Center being created, located in the Main Building of the Dispatcher Central in Tashkent. The overall system strategy of this pilot project is to have an open and scalable architecture to allow for smooth expansion of the System with future components vertically and horizontally, integration of external systems and other auxiliary internal systems of the Client. The System's central control platform should also be able to integrate with other ITS and WIM components, systems and equipment planned for future expansion to other road networks in Uzbekistan.

Scope of work

  1.  
  2. Initial design for the installation and integration of measurement and monitoring devices for the Intelligent transport system and weigh in motion systems;
  3. Concept development for budget estimation and feasibility approval;
  4. Preparation of tender documentation and technical requirements; 
  5. Consulting and evaluation of tenderers; 
  6. review and verification of the contractor's technical design;
  7. supervision of construction execution, 
  8. acceptance and supervision during defect liability period.

Related projects

All projects →

Ready to connect?

Discover how Kibera Consult can enhance the delivery of your next project.

Thanks — your message is with us. We reply within two working days.